Fozimage - Masthead - A38
 

A38 Dobwalls Bypass - October 2007 - Moorswater

At Moorswater the Eastern carriageway is taking shape and the culverts over the East Looe River are being levelled. Moorswater Moorswater

Moorswater Moorswater

Over the other side of the road a small wall is being built.

East Looe river culverts Drainage wall

and the foundations of the Eastern carriageway are being laid.

Eastbound carriageway Eastbound carriageway

Later in the month the foundation work continues.

Eastbound carriageway Eastbound carriageway

The tarmac surface of the footpath has been laid and we are able to walk along this route. A fence is being built by the embankment.

New footpath New footpath

Here we can see the depth of the foundations and the purpose of the small wall becomes clear as it is the location of a natural spring which needs drainage.

Depth of road foundations Drainage wall

Here we look over the East looe River culverts towards Looe Mills.

Looking towards Looe Mills Looking towards Looe Mills

<< - October 2007 - >>

Any views on the bypass
or these images?
Let me know by using my
feedback link.

RSS Feed button