Work continues to move the earth over the new tunnel. The work specifications are allowing 1m of infill per week.

Railway tunnel from Beneathway Railway tunnel from Beneathway

The level is nearly there.

Railway tunnel from the roundabout Railway tunnel from the roundabout

This allows the route of the new A390 to be excavated. The size of the site compound is reduced to allow the earth to pile up.

Embankments are created for the new A390 Site compound

Embankments are created for the new A390.

Embankments are created for the new A390 Embankments are created for the new A390

The temporary road still carries the traffic bu the old A38 each side is being cleared.

Temporary A390 Old A38 looking west

Old A38 looking east Old A38 looking east

The garden sheds have been cleared from the old site Pearce's portable buildings and the road into the village is quiet.

Pearces portable buildings Old A38 looking east